D-Link DGS-3000-10TC Installation Guide Page 29

  • Download
  • Add to my manuals
  • Print
  • Page
    / 67
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 28
DGS-3000 Series Layer 2 Managed Gigabit Switch Hardware Installation Guide
21
Chapter 3 Connecting the Switch
Switch to End Node
Switch to Switch
Connecting To Network Backbone or Server
NOTE: All high-performance N-Way Ethernet ports can support both MDI-II and MDI-X connections.
Switch to End Node
End nodes include PCs outfitted with a 10, 100 or 1000 Mbps RJ-45 Ethernet Network Interface Card (NIC) and
routers. An end node connects to the Switch via a twisted-pair UTP/STP cable. Connect the end node to any of the
1000BASE-T ports of the Switch. The Link/Act LEDs for each Ethernet port will light green or amber when the link is
valid. A blinking LED indicates packet activity on that port.
Figure 3-1 Connecting the Switch to an end node
Page view 28
1 2 ... 24 25 26 27 28 29 30 31 32 33 34 ... 66 67

Comments to this Manuals

No comments